Your cart is currently empty!
FSP-951-CH Smoke Detector
Available Variations
Sensitivity | Model | Location | Availability | Stock | Compare |
---|---|---|---|---|---|
0.5% to 4.0% per foot obscuration | FSP-951-CH | India | 7 days | 270 |
The NOTIFIER FSP-951 Series intelligent plug-in smoke detectors
are designed for both performance and aesthetics. A new modern,
sleek, contemporary design and enhanced optical sensing chamber
is engineered to sense smoke produced by a wide range of combustion sources in accordance with more stringent code standards. The
FSP-951 Series detector sensitivity can be programmed in the control panel software. Sensitivity is continuously monitored and
reported to the panel. Point ID capability allows each detector’s
address to be set with rotary, decimal address switches, providing
exact detector location for selective maintenance when chamber
contamination reaches an unacceptable level. Dual electronic
thermistors add 135°F (57°C) fixed temperature thermal sensing on
the FSP-951T. The FSP-951R is a remote test capable detector for
use with DNR Series duct detector housings. FSP-951 series detectors are available for both FlashScan® and CLIP applications as
designated.
Manufacturer | Notifier |
---|
No data tables available
No documentation or downloads available
-
Wirop Wireless Loadlink Set
$2.500,00Ships as early as 1 day from UAE -
VLL Zone 1 GRP LED Fixture
–Ships as early as 7 days from India -
HPLN Zone 1 LED Fixture
–Ships as early as 7 days from India -
VLL Sliding Rail
–Ships as early as 7 days from India -
Trunnion Ceiling Mounting Bracket
–Ships as early as 7 days from India -
VES Sector Addressable LCD Fire Detector
–Ships as early as 7 days from India
These latest additions might interest you
-
Wirop Wireless Loadlink Set
$2.500,00Ships as early as 1 day from UAE -
Trelleborg Pneumatic Fender New
$6.500,00 – $20.000,00Ships as early as 1 day from UAE -
PP Rope
$1.800,00Ships as early as 1 day from Lome -
Yokohama Pneumatic Fender Used
$9.000,00 – $24.500,00Ships as early as 1 day from UAE -
VLL Zone 1 GRP LED Fixture
–Ships as early as 7 days from India -
HPLN Zone 1 LED Fixture
–Ships as early as 7 days from India